Contribute with the production of
157.4 million kWh per year of pure solar energy to fulfill the commitments
Spain has assumed in Kyoto to the reduction of emissions
|
 |
Provide this solar electricity without fluctuation or interruption, thanks
to the 7 hour storage, maintaining the stability of the electric grid
|
 |
Avoid the emission of 152 million kilos of CO2 per year to protect the
climate and the environment |
 |
Create about 50 permanent jobs for operation and maintenance of the
AndaSol-1 project, employing up to a maximum of 500 workers during the
construction period of approximately two years |
 |
Make maximum use of the local resources of labor and construction material
supply in an economically depressed region |
 |
Develop the basis for experience and infrastructure of a promising resource
of renewable energy, thus leading to additional opportunities of employment
and fabrication. |
|
 |
nTechnology:
„Solar-only“ Parabolic Trough Power Plant
|
 |
nInstalled
Capacity:
3 x 49,9 MWel
|
 |
nStorage:
Two-tank molten salt storage for 7 full load hours
|
 |
nProject
Site:
Plateau of Guadix, Province Granada,
Spain
|
 |
nNet
electricity production:
3 x 157 Mio. kWh/a
|
 |
nInvestmentbudget:
approx. 260 Mio. € per plant
|
|